Garrett Underpass:
Project Fact Sheet
![]()
|
City of Garrett |
|
City of Garrett Dekalb County Indiana Department of Transportation CSX Transportation |
|
Congdon Engineering Associates, Inc. |
|
ETS / PSI |
|
S.E. Johnson Companies |
|
$7,500,000 INDOT covers 80% of construction cost; CSX covers 20% of construction cost as "local match." City of Garrett has committed $250,000 for design and construction engineering. Dekalb County has committed $300,000 for construction engineering and contingencies. |
|
4 |
|
3 span steel deck, 96 feet in length. |
|
1,115 feet |
|
3 phase, 8,800 gallons per
minute pumps (peak load). Diesel generator backup. |
|
7,700 feet (1.458 miles)...drains to Carper South ditch east of Garrett. |
|
Soldier Pile Walls, 17,800 square feet of surface. |
![]()
Provided as a public service, and Copyright,
1999-2002,
City of Garrett, Indiana
This site developed and maintained by Steve Bingham,
Planning Director, City of Garrett, Indiana