Garrett Underpass:
Project Fact Sheet

  • Lead Agency

City of Garrett
  • Participating Agencies

City of Garrett
Dekalb County
Indiana Department of Transportation
CSX Transportation
  • Design / Construction Engineer

Congdon Engineering Associates, Inc.
  • Geotech Consultant

ETS / PSI
  • Constractor

S.E. Johnson Companies
  • Construction Cost

$7,500,000

INDOT covers 80% of construction cost; CSX covers 20% of construction cost as "local match."

City of Garrett has committed $250,000 for design and construction engineering.

Dekalb County has committed $300,000 for construction engineering and contingencies.

  • Number of Tracks  routed over permanent bridge

4
  • Permanent Bridge Details

3 span steel deck, 96 feet in length.
  • Roadway length on S.R. 327 (Randolph Street)

1,115 feet
  • Lift Station Details

3 phase, 8,800 gallons per minute pumps (peak load).
Diesel generator backup.
  • Length of Force Main

7,700 feet (1.458 miles)...drains to Carper South ditch east of Garrett.
  • Retaining Walls

Soldier Pile Walls,
17,800 square feet of surface.